Choose a KPI for an Experiment

Updated November 24, 2026 · 2 min read

The KPI of an Experiment is one Result column from the Play. Measure it as a success rate (the share of conversations that match a rule) or as an average, and say whether higher or lower is better.

Set the KPI

  1. In the New experiment sheet, go to KPI to compare and open Column. It lists every column you can use for this Play's KPIs, grouped as Built-in column, Result field and Dynamic column.
KPI to compare section with the Column list open on built-in columns such as CSAT, Resolution and Escalated.
  1. For a numeric column such as CSAT, choose Average or Success rate. Yes/no and text columns are always measured as a success rate.
  2. For Success rate, set Counts as success when the value: is true, is false, equals, does not equal, is at least, is at most or contains, plus a Value where needed.
  3. Set Better when to Higher or Lower.
KPI set to CSAT as a Success rate that counts when the value is at least 4, with Better when set to Higher.

Success rate or Average?

Metric

What it measures

Example

Success rate

Share of conversations or items where the rule matches

Resolved without a human is true, higher is better

Average

Mean of a numeric column

Messages until resolution, lower is better

Tips for a useful KPI

  • Pick the one outcome your Skill change is meant to move. Other columns are still visible on the Play's Results.
  • Only processed Results count. Pending and failed Results are left out.
  • Need a label the Play doesn't write yet? Add a Dynamic column on Results first (for example, a classification of the reply tone). New Results fill it in automatically, so you can use it as the KPI.

FAQ

Can an Experiment have more than one KPI?

No. Each Experiment compares versions on one KPI. You can still filter and read every other column on the Play's Results.

Why isn't my column in the list?

The list shows the columns available for this Play's KPIs. Add a Result field or a Dynamic column to the Play if the value you need isn't there.

Can I change the KPI after the Experiment starts?

No. Edit is only available for Draft and Scheduled Experiments. To measure something else, stop it and create a new Experiment, or duplicate a completed one.

Related articles

← All help articles